Construction sequence (build order)

Sequence insulation, electrical rough-in, plumbing, and cabinetry so later work does not undo earlier stages.

Last updated November 9, 2026

Why sequence matters

Van conversions fail schedules when wiring is trapped behind finished panels or tanks are sealed in before fill/drain paths are proven. A build-order checklist keeps trades and DIY stages in a sane dependency graph.

Using /tools/build-order

Open /tools/build-order for a structured phase list you can adapt to your layout. Typical high-level stages include strip-down, insulation and vapour strategy, electrical and plumbing rough-in, wet-room shell, cabinetry, finish systems, then weigh-in.

From a saved build, open Construction order to derive the checklist from that project's equipment and systems. Tool links return to the matching project section. The checklist reads the saved version, so save project changes before refreshing it.

Complete prerequisites before checking downstream tasks. Equipment or dimensions changed since a task was completed can require a fresh review. Progress is stored in this browser for the current account and project; it is not cloud-synced or included in the exported build document. Export CSV or print the checklist to keep a workshop copy.

  • Freeze major fixed points (battery location, tank bays, roof penetrations) before finish carpentry.
  • Re-run payload after heavy items are installed for real—not only on the spreadsheet.
  • Treat the checklist as planning guidance, not a licensed contractor scope of work.